Site Logo Site Logo
shape shape

Ongoing Projects

Comprehensive Conservation Plan for Arulmigu Kasi Viswanathar Temple, Tenkasi

Start Year 01-12-2019

Project Duration 12 Months

Project Description :

The aim of the project is to map the distress in terms of locations, occurrences, classifications and their respective severity and identify distress patterns and interlinkages. Impact of adjacent urban development on Temple distress shall also be identified. The causes and issues shall be deduced and a detailed Project report for identified key intervention areas shall be prepared.

Key Highlights:

A methodical and scientific diagnosis was carried out to study the cause and extent of distress and effectiveness of intervention. The temple consists of two typology of construction the stone structures and the RCC gopuram. The conservation statergy was worked out based on the issues identified which involves Protection, Maintanence measures and carying out localised repairs through optimal intervetion techniques.

Project Profile

Client : TNHRCE

Location : Tenkasi

Vertical : Urban Planning And Transportation

Services : Technical consultancy