Site Logo Site Logo
shape shape

Completed Projects

Preparation of DPR for installation of on Grid Solar PV systems to achieve Net-Zero energy status for Madhavaram Mofussil Bus Terminus

Start Year 29-04-2022

Project Duration 12 months

Blog Thumbnail

Project Description :

The study is to achieve the “Net Zero Carbon Emission Status” for MMBT bus terminus facility by offsetting the carbon emissions thro’ a renewable “On-grid Solar Power plant system”. The study / report aims to synergize the energy conservation opportunities, efficiency enhancement of the existing systems through on-grid solar power production to migrate towards “net zero carbon” status of the MMBT facility

Key Highlights:

This study would assist the bus stand to achieve Net Zero status by the end of execution phase.

Project Profile

Client : CMDA

Location : Chennai,Tamil Nadu

Vertical : ENVIRONMENT AND SUSTAINABILITY

Services : Preparation of DPR Assessment of power consumption and to pepare solar panel layout