Site Logo Site Logo
shape shape

Completed Projects

Report on Validation of Finished Ground Level of the proposed Royal Enfield Factory at Cheyyar SIP (Phase I).

Start Year 02-11-2022

Project Duration 3 months

Project Description :

M/S Royal Enfield had planned to construct a factory at Cheyyar SIPCOT Industrial Park in a plot which lies in the catchment of a lake named Nappan. CUBE was assigned to provide possible engineering solutions so as to prevent direct discharge of water from the factory premises and also ensure that there is no inundation in the factory premises.

Key Highlights:

A strategic approch to help tackle the inundation caused in the Nappan lake was studied.

Project Profile

Client : S.N. Pingle Consultants

Location : Thiruvannamalai, Tamil Nadu

Vertical : ENVIRONMENT AND SUSTAINABILITY

Services : Technical solution