Site Logo Site Logo
shape shape

Completed Projects

Feasibility Study on Identification of Alternate Location for Parayan Kuttai Water Body & Surface Water Optimization Plan for Caterpillar India Private Limited

Start Year 20-01-2023

Project Duration 5 months

Project Description :

  • Evolve an alternate location for Parayan Kuttai water body and its surplus arrangement through detailed analysis of the catchment at macro and micro level with minimal impact on the upstream and the downstream side of the water body.
  • Estimation of Surface Water Potential of the Caterpillar India Private Limited (CIPL) and its immediate adjoining areas wherever applicable.
  • Adequacy check on the existing Storm Water Drain network to support the arrived Surface Water Optimization Plan and abatement of inundation. Propose new / additional Storm Water Drain Network for the same, where required.
  • Recommend suitable Water Conservation Strategies to make CPCL self-reliant on its water requirements.

Key Highlights:

Alternate location for Parayan Kuttai water body and its surplus arrangement. Adequacy check for existing drains and proposed stormwater drains networks.

Project Profile

Client : CATERPILLAR INDIA PRIVATE LIMITED

Location : Thiruvallur, Tamil Nadu

Vertical : ENVIRONMENT AND SUSTAINABILITY

Services : Identification of Alternate Location for Parayan Kuttai Water Body & Surface Water Optimization Plan